power distribution cabinet

Custom Motor Control System Successfully Delivered for UAE Water Infrastructure Project

Dec 10, 2025

In a significant boost to municipal water management in the United Arab Emirates, a specialized electrical control solution has been successfully delivered for a key sewage treatment project. The deployment features a centralized 5-unit configuration, comprising two heavy-duty Soft Start Control Cabinets and three auxiliary Motor Control Boxes, designed to handle the complex mixed-load demands of modern wastewater facilities.

 

The project required a robust power distribution strategy to manage substantial electrical loads in a harsh operating environment. The facility operates high-inertia loads, specifically 132kW and 160kW high-power motors, alongside multiple smaller auxiliary pumps. Direct-on-line starting for motors of this caliber was ruled out due to the risk of severe mechanical stress on pipework and instability in the local power grid.

 

Addressing this, the newly installed Soft Starter Panels employ precision voltage ramping technology. This "soft start" capability is critical for the UAE’s infrastructure, where reliability is paramount. By gradually controlling the acceleration of the 132kW and 160kW motors, the system eliminates the damaging "water hammer" effect, significantly extending the lifecycle of the pump impellers and reducing maintenance frequency on the hydraulic network.

 

Soft start control cabinet (10)(48a4d96560).jpg   Soft start  cabinet (9).jpg

 

To complement the high-power units, the solution integrates three dedicated Motor Control Boxes for the facility’s medium and small-power equipment. These units function as the distribution hub, providing a complete "Power Distribution – Intelligent Start/Stop – Protection" link. The cabinets are engineered with industrial-grade thermal management—essential for the region's high ambient temperatures—and feature orderly internal layouts to facilitate quick on-site troubleshooting.

 

Control distribution cabinet (6).jpg  motor control box (7).jpg  motor control box (2).jpg

 

"This solution moves beyond basic switching," said the technical lead for the project. "It addresses the specific pain points of scattered control and high inrush currents." By consolidating the control of both heavy and light loads into a unified, safety-compliant system, the sewage treatment plant has secured a stable, energy-efficient operation that minimizes downtime and protects critical assets against overloads and phase failures.

Нужна помощь? Поболтай с нами

оставить сообщение
Для любого запроса информации или технической поддержки заполните форму. Все поля, отмеченные звездочкой*, обязательны для заполнения.
представлять на рассмотрение
Находясь в поиске FAQs?
СВЯЗАТЬСЯ С НАМИ #
+86-18960903717

Наши часы

Пн, 21 ноября – Ср, 23 ноября: 9:00 – 20:00.
Чт, 24.11: закрыто. С Днем Благодарения!
Пт, 25 ноября: 8:00–22:00.
Сб 26.11 – Вс 27.11: 10:00 – 21:00
(все часы по восточному времени)

Дом

ПРОДУКТЫ

WhatsApp

Контакты